The 11 departments every interior project should be tracked against
There is no industry standard chart of accounts for residential interiors. Here is the 11-bucket split we have found works for studios doing 2–4 BHK projects.
If you ask ten interior studios how they split a project budget, you will get ten different answers. Some split by room, some by trade, some by vendor. None of those scale.
We settled on an 11-department split because it maps cleanly to how vendors quote and how site engineers think about progress.
The 11 buckets
- Civil Works — masonry, demolition, waterproofing
- Carpentry & Joinery — wardrobes, beds, kitchen cabinetry
- False Ceiling Works — POP, gypsum, cove lights
- Electrical Works — wiring, switches, light fixtures
- Plumbing Works — pipes, fittings, sanitaryware
- Painting & Polishing — wall paint, PU polish, texture
- Tiling & Flooring — tiles, marble, wooden flooring
- HVAC / Air Conditioning — AC, copper piping, ducting
- Glass & Glazing — shower partitions, mirrors, balcony
- Modular Furniture / Upholstery — sofa, dining, beds, curtains
- Miscellaneous — the catch-all for everything else
Why eleven, not seven or fifteen
Seven is too coarse — civil and carpentry are completely different vendors with different payment cycles, and lumping them loses the signal. Fifteen is too granular — your site engineer will not consistently tag a ₹400 hinge to "Hardware — wardrobe — soft-close".
Eleven hits the sweet spot: every department maps to either a single vendor or a tight cluster, and the buckets are unambiguous enough that two different site engineers will tag the same expense the same way.
One rule
Resist the urge to create project-specific departments. "Smart home — Mr. Mehta villa" feels useful when you are building the budget, but it makes cross-project analytics impossible. Tag it to Electrical and use the description field for the detail.
Try the workflow this post describes
Free to start. Quote, accept, and seed a real project budget in under five minutes.